Stevenson Consulting Services provided Owners Project Management for a $1.8 Million lobby renovation. SCS handled preliminary budgeting and contractor selection while working closely with Chapman Construction on scheduling, coordination, cost control, and change order management. SCS acted as a liaison between Inspectional Services and the project.
Architect: GRLA
General Contractor: Chapman Construction
MEP Trades: Capitol Engineering, Brattan Industries, Legacy Fire Protection
Major Sub Trades: Pavilion Floors, Kaloutas Painting, Wayside Glass, Optimum Building Systems, ABS Demo, Tenant Systems
Stevenson Consulting simultaneously provided CMa services to replace the atrium smoke exhaust system. The existing fans were 30+ years old and belt driven, meaning they were no longer performing properly. The new 18,000 CFM direct drive fans eliminate the need for belt maintenance.
Major SubTrade: Capitol Engineering