Stevenson Consulting Services provided CMa services from design, budget, and value engineering to procurement, executions, and closeout for the renovation of 22 bathrooms within two fully occupied buildings. The renovation was strategically phased to minimize disruption to owner's operations.
Architect: GRLA
MEP Trades: Capitol Engineering, Brattan Industries, North Shore Mechanical Contractors, Yankee Sprinkler
Major Sub Trades: Pavilion Floors, Automation Solutions, EMC Drywall, Tenant Systems, Optimum Building Systems, ABS Demo, Kaloutas Painting, Wayside Glass, AP Dailey, General Woodworking